Interstate 4

Interstate 4 marker

Interstate 4
Route information
Maintained by FDOT
Length: 132.30 mi[1][2] (212.92 km)
Existed: 1957 – present
Major junctions
West end: I-275 in Tampa
  US 92 / US 301 near Tampa
I-75 near Tampa
US 98 in Lakeland
US 27 near Davenport
US 192 in Celebration
Turnpike in Orlando
SR 408 in Orlando
US 17 / US 92 / US 441 in Orlando
East end: I-95 / SR 400 in Daytona Beach
Location
Counties: Hillsborough, Polk, Osceola, Orange, Seminole, Volusia
Highway system

Main route of the Interstate Highway System
Main • Auxiliary • Business

Florida State and County Roads

SR 3 SR 4

Interstate 4 (I-4) is a 132.30-mile (212.91 km) intrastate Highway located entirely within the state of Florida, United States. It goes from Interstate 275 in Tampa, Florida () to Interstate 95 at Daytona Beach, Florida (). It also has the Florida Department of Transportation designation of State Road 400, but only a small portion of the route is signed at the east end. I-4 is currently the lowest-numbered Interstate Highway in the contiguous 48 U.S. states. The area that surrounds I-4 is often referred to as the I-4 Corridor.

Contents

Route description

I-4 maintains a diagonal, northeast-southwest route for much of its length, although it is signed east-west. The 132-mile (212 km) route begins with an interchange with I-275 in Tampa and continues east toward I-75.

After passing through the eastern suburbs of Hillsborough County, it crosses into Polk County, entering the Lakeland area, intersecting with the Polk Parkway twice before entering Polk City.

At this point, the interstate starts a turn toward the northeast where it intersects with the Orlando area cutting the city through at a diagonal direction going northeast/southwest. The route provides access to all of Orlando's theme parks including Disney World and Universal Studios, as well as nearly all of Orlando's toll roads, including Florida's Turnpike. Throughout most of Orange County and Seminole County, I-4 travels in a roughly north–south direction.

Interstate 4 eastbound at exit 111 in Volusia County

Right before the eastern terminus, I-4 switches to a mostly east/west route in order to connect with traffic from and to I-95. At an interchange with I-95 in Daytona Beach, I-4 terminates; however, SR 400 continues eastward into Daytona Beach.

SR 400, unsigned while concurrent with I-4, becomes signed east of I-95. The road extends for three miles (5 km) from the northeast terminus of I-4, on the south side of Daytona International Speedway and Daytona Beach International Airport, to an intersection with U.S. Route 1 (SR 5) in Daytona Beach. Named Beville Road, it runs along the boundary between the cities of Daytona Beach and South Daytona.

History

I-4 was one of the first Interstate Highways to be constructed in Florida, with the first section opening between Plant City and Lakeland in 1959. By early 1960, the Howard Frankland Bridge was opened to traffic, as well as the segment from the Hillsborough Avenue/ US 301 junction in Tampa to Plant City. The stretch from Lake Monroe to Lake Helen, including the original St. Johns River Bridge also opened during that period. The segment from Lakeland to Orlando was complete by 1962. By the mid 1960s, several segments were already complete, including Malfunction Junction in Tampa and parts of I-4 through Orlando. The original western terminus was set in South Pasadena in the late 1960s, but this plan was rejected due to local opposition. As a result, I-4 only went as far southwest as 9th St N in St. Petersburg.

The original plans called for I-75 to end in Tampa

The entire Interstate Highway was completed by the late 1960s, however, the western terminus was truncated to Malfunction Junction in 1971 when I-75 was extended over the Frankland Bridge. Eventually, that stretch was again redesignated to become part of I-275.[3]

In maps and atlases dating to the 1950s, 1960s, and 1970s, The Tampa/St. Petersburg section of Interstate 4/Interstate 275 was marked as the Tampa Expressway. The Orlando segment was marked as the Orlando Expressway. Both names have since faded from maps.

Although many post-1970 interchanges along I-4 were constructed before the recent widening projects, they were designed with I-4 expansion in mind. In other words, there is enough room available to widen I-4 to up to ten lanes without extensively modifying the interchanges. Some of these interchanges include the Interstate 75 stack (constructed in the 1980s) and several interchanges serving the Walt Disney World Resort (constructed in the late 1980s/early 1990s).

In the 2004 U.S. presidential election, the I-4 corridor, a site of significant growth, was a focus of political activity within the swing state of Florida. Communities along the I-4 corridor were perceived by both major political parties as having higher proportions of undecided voters as compared to more Republican- or Democratic-leaning portions of the state. It played an equally key role in the 2008 U.S. presidential election, but whereas the corridor had voted heavily for Bush in 2004, which helped Bush win the state, in 2008 it swung behind Democratic candidate Obama, helping Obama win Florida.[4]

A section of I-4 called the 'dead zone' is rumored to be haunted.[5]

Tampa area

The I-4/I-275 interchange (Malfunction Junction) was rebuilt from 2002 to 2006, and I-4 is under staged renovations to be widened from four to six lanes (with eight lanes in certain segments). Much of this work is complete, and all new travel lanes are now open. Eventually, I-4 will be widened again to a total of at least ten lanes (five in each direction). Studies for this project are already underway and construction should commence sometime in the 2010s. Completion of the project should be around 2020.

Eastbound I-4 shifted to its new, permanent alignment between Malfunction Junction and 50th St on Tuesday, August 8, 2006 at 5:30 am. The new alignment includes a right-lane ramp exit/entry at the 22nd St/21st St Interchange (The previous left-lane configuration was causing hazardous conditions to commuters since its opening in 2005). On Friday, August 11, 2006, a fourth lane opened on eastbound I-4 between the downtown junction and 50th St (led in by a newly opened third lane on the eastbound I-4 ramp from northbound I-275). And on Friday, August 18, the new westbound alignment, just west of 50th Street, opened. The newly opened lanes will improve flow throughout the interchange. The 50th St overpass however, will not be complete until late 2007.[6][7][8][9] Also, the eastbound I-4 exit ramp to Columbus Drive/50th Street is situated to the left-hand side of the highway (as opposed to its former right-hand side exit). This exit shift went into effect in spring 2006 and is part of the new, permanent interstate configuration.

In Tampa, the exit to 40th Street (State Road 569) has been closed since late 2005 due to the ongoing reconstruction of I-4; it will not reopen due to a proposed connector highway with the Lee Roy Selmon Crosstown Expressway.[10]

The interchange with what is today Interstate 75 was constructed in the early 1980s.

Orlando area

As Orlando grew in the 1970s and 1980s, traffic became a growing concern, especially after the construction of the original interchange with the East–West Expressway in 1973, which proved to become a principal bottleneck. The term "highway hostages" was coined in the 1980s to describe people stuck in long commutes to and from Orlando on I-4.

An old I-4 shield in Orlando

In the early/mid 1990s, several interchanges near Kissimmee were constructed/upgraded to accommodate increasing traffic going to and from Walt Disney World. However, I-4's main lanes were not widened in the process. Around the same time, the Southern Connector was extended to I-4.

The St. Johns River Veterans Memorial Bridge, a two-span six-lane replacement to the original four-lane bridge over the St. Johns River northeast of Orlando, was completed in 2004.

During the early 2000's, tolled express lanes were being planned in the Orlando area as a traffic congestion relief technique for rush hour commuters. The name for them was to be Xpress 400, numbered after the state road designation for I-4, SR 400. The express lanes were slated to extend from Universal Orlando, east to SR 434 in Longwood, and tolls were to be collected electronically via transponders like SunPass and Orlando-Orange County Expressway Authority's E-Pass, with prices dependent on the congestion of the eight main lanes. However, the project was effectively banned by the passage of the SAFETEA-LU Federal transportation bill in 2005, introduced by U.S. Representative John Mica. The plan for tolled express lanes, however, is still in the long term plans for I-4.[11]

The eastbound exit to Robinson Street (State Road 526) permanently closed at 11PM on April 25, 2006, to make way for construction of the new eastbound onramp from State Road 408.[12] The westbound offramp to Gore Street was permanently closed in the same project on 2008-02-11.

The new overpass from I-4 west to John Young Parkway (County Road 423) opened the morning of April 27, 2006.[13][14][15]

2008 Pileup

On January 9, 2008, 70 vehicles were involved in a large pileup on I-4 near Polk City. The pileup was caused by an unexpected thick morning fog that was mixed with a scheduled—and approved—environmental burn by the Florida Wildlife Commission. The fog drifted across I-4, mixing with the smoke, reducing visibility to near-zero conditions. Four people were killed, and 38 were injured. The section of I-4 did not re-open until 6:30 pm the next day, January 10.[16]

Future

Interim improvements to the interchange at State Road 408 were completed at the end of 2008.[17] The rest of the SR 408 improvements are scheduled for the next decade. Intersections at US 192[18] and I-275[19] were completed in 2007. The remaining four-lane segment, from SR 44 to I-95, will eventually be widened to six lanes, with construction anticipated to begin in 2012.[20]

Planning is underway for "ultimate" improvements to Interstate 4 through Orlando from SR 435 (exit 75) east to SR 434 (exit 94).[21] These plans involve adding express lanes to the highway, and the reconstruction of several major interchanges. Construction is scheduled to begin in 2014. Right-of-way procurement alone will top $400 million.[22]

Exit list

County Location Exit # Destinations Notes
Old New
Hillsborough Tampa I-275 – St. Petersburg, Ocala, Tampa International Airport westbound exit and eastbound entrance
1 1 SR 585 (22nd Street) / 21st Street
2 2 South plate.svg
Toll Florida blank.svg I-4/Crosstown Connector south
To plate.svg
Toll Florida 618.svg to Lee Roy Selmon Crosstown Expressway/Port of Tampa
Connector under construction as of 2010, scheduled to open in 2013
3 3 US 41 / 50th Street, Columbus Drive Eastbound left exit, westbound left entrance. Eastbound right entrance and westbound right exit.
4 5 SR 574 (Martin Luther King Jr Boulevard)
5 6 Orient Road eastbound exit and westbound entrance
East Lake-Orient Park 6 7 US 92 (Hillsborough Avenue) / US 301 – Riverview, Zephyrhills Congestion may occur on days when the state fair is on. Traffic delays on the interstate can be common with major tailbacks in either direction.
7 9 I-75 – Ocala, Naples
8 10 [[|]] / Mango Road – Mango, Thonotosassa
9 14 McIntosh Road
10 17 Branch Forbes Road
Plant City 11 19 SR 566 (Thonotosassa Road)
13 21 SR 39 (Buchman Highway) / Alexander Street – Zephyrhills
14 22 SR 553 (Park Road)
15 25 County Line Road
Polk Lakeland 15A 27 East plate.svg
Toll Florida 570.svg SR 570 East (Polk Parkway) – Winter Haven, Bartow
16 28 No image wide.svgTo plate.svg
SR 546 to US 92
17 31 SR 539 – Kathleen
18 32 US 98 – Dade City
19 33 SR 33 / [[|]]
20 38 SR 33
Polk City 20A 41 West plate.svg
Toll Florida 570.svg SR 570 West (Polk Parkway) – Auburndale, Lakeland
21 44 SR 559 – Polk City, Auburndale
22 48 [[|]] – Lake Alfred, Winter Haven
23 55 US 27 – Haines City, Clermont
24 58 [[|]] – Kissimmee, Poinciana
Osceola
24B 60 North plate.svg
Toll Florida 429.svg SR 429 North – Apopka
Celebration 24C-D-E 62 East plate.svg
Toll Florida 417.svg Toll SR 417 east, World Drive – Disney World, Celebration, Sanford, International Airport
25A-B 64A-B US 192 – Celebration, Kissimmee, Magic Kingdom, Disney's Hollywood Studios
26C-D 65C-D Osceola Parkway – Animal Kingdom, Disney's Wide World of Sports Complex was only 26C eastbound
Orange Lake Buena Vista 26A-B 67A-B No image wide.svgTo plate.svg
Florida 536.svgToll Florida 417.svg SR 536 To SR 417 – Epcot, Downtown Disney
27 68 SR 535 – Kissimmee, Lake Buena Vista
27A 71 Central Florida Parkway – Sea World eastbound exit and westbound entrance
Orlando 28 72 SR 528 east (Martin Andersen Beachline Expressway) – International Airport, Cape Canaveral
29 74A SR 482 (Sand Lake Road) was 29A westbound after 29B (current 74B) opened
29B 74B Universal westbound exit and entrance
30A-B 75A-B SR 435 (Kirkman Road) – Universal
31 77 Turnpike / SR 91 – Miami, Wildwood
31A 78 Conroy Road – The Mall at Millenia
32 79 [[|]] (John Young Parkway)
33A-B 80A-B US 17 / US 92 / US 441 (Orange Blossom Trail)
34 81A Michigan Street westbound exit and eastbound entrance
35 81B-C Kaley Avenue was split into 35A and 35B westbound only
36 82A SR 408 (east-west Expressway)
37 82B South Street/Anderson Street South Street: Eastbound exit / Anderson Street: Westbound exit
38 82C Anderson Street East Temporarily Closed for construction of the new Anderson Street Bridge
39 83 South Street westbound exit and eastbound entrance
41 83B US 17 / US 92 / SR 50 (Colonial Drive) / Amelia Street, Amway Arena
42 84 Ivanhoe Boulevard
43 85 Princeton Street Continues as SR438 after the intersection with US 441
Winter Park 44 86 Par Street eastbound exit and westbound entrance
45 87 SR 426 (Fairbanks Avenue)
46 88 SR 423 (Lee Road)
Maitland 47 90 SR 414 (Maitland Boulevard) split into 90A and 90B eastbound
Seminole Altamonte Springs 48 92 SR 436 – Altamonte Springs, Apopka
49 94 SR 434 – Longwood, Winter Springs
Lake Mary 50 98 Lake Mary Boulevard – Lake Mary, Heathrow
Sanford 51A 101A [[|]] (Paola Road) – Heathrow
101B South plate.svg
Toll Florida 417.svg SR 417 South (Central Florida GreeneWay) – International Airport
51 101C SR 46 – Mount Dora
52 104 US 17 / US 92
Volusia Deltona 53 108 CR 4162 (Dirksen Drive/DeBary Avenue) – DeBary, Deltona
53CA-CB 111 CR 4146 (Saxon Boulevard) – Deltona, Orange City split into 111A and 111B eastbound
Orange City 54 114 SR 472 – Deltona, DeLand
Lake Helen 55 116 Volusia County Road 4116 FL.svg County Road 4116 - Orange Camp Road - Lake Helen
56 118 SR 44 (New York Avenue) – New Smyrna Beach
Daytona Beach 57 129 East plate.svg
US 92 east
eastbound exit and westbound entrance
58 132 No image wide.svgEast plate.svg
I-95 / SR 400 east – Jacksonville, Miami, South Daytona
eastbound exit and westbound entrance

See also

References

External links

Interstate 4 travel guide from Wikitravel

Main Interstate Highways (major interstates highlighted)
4 5 8 10 12 15 16 17 19 20 22 24 25 26 27 29 30
35 37 39 40 43 44 45 49 55 57 59 64 65 66 68 69
70 71 72 73 74 75 76 (W) 76 (E) 77 78 79 80 81 82
83 84 (W) 84 (E) 85 86 (W) 86 (E) 87 88 (W) 88 (E) 89 90
91 93 94 95 96 97 99 H-1 H-2 H-3
Unsigned  A-1 A-2 A-3 A-4 PRI-1 PRI-2 PRI-3
Lists  Primary  Main - Intrastate - Suffixed - Future - Gaps
Auxiliary  Main - Future - Unsigned
Other  Standards - Business - Bypassed